Carefully plan the area checking all measurements. Measure and cut deck boards where required.
Fix the deck board to the riser by pre-drilling holes top and bottom and screwing through the face of the deck board. Start at 80mm approx then at every 300mm max intervals. Ensure that the deck board finishes flush with the top of the tread and avoid screwing through grooves.
Fix starter clips to the inside of the tread every 300m max intervals. Screw through the hole on each starter clip with the screws provided ensuring that the screw is fully screwed into place to prevent catching on the deck board underneath.
Fix the inner deck board by clipping into the starter clip. Check the deck board is securely in place before continuing.

Fix metal clips to the inner deck board at every joist with the screws provided. Place the metal clips into the deck board groove and screw the other side down through the hole.

Fix plastic clips to the inner deck board at every joist with the screws provided. Place the side of the plastic clips into the deck board groove and screw down half way ensuring they are upright. Screw down fully when the next deck board is in place.

Fix the last deck board as normal finishing flush with the deck board riser but do not fix any clips to the outer groove. Pre-drill holes and screw through the outer groove at an angle and into the joist with the screws provided. Start at 80mm approx then at every 300mm approx intervals.

Carefully plan the area checking all measurements. Measure and cut deck boards and fascia where required.
Fix starter clips to the inside of the tread every 300m max intervals. Screw through the hole on each starter clip with the screws provided ensuring that the screw is fully screwed into place to prevent catching on the deck board underneath.
Fix the inner deck board by clipping into the starter clip. Check the deck board is securely in place before continuing.

Fix metal clips to the inner deck board at every joist with the screws provided. Place the metal clips into the deck board groove and screw the other side down through the hole.

Fix plastic clips to the inner deck board at every joist with the screws provided. Place the side of the plastic clips into the deck board groove and screw down half way ensuring they are upright. Screw down fully when the next deck board is in place.

Fix the last deck board as normal finishing flush with the riser but do not fix any clips to the outer groove. Pre-drill holes and screw through the outer groove at an angle and into the joist with the screws provided. Start at 80mm approx and then at every 300mm approx intervals.

Fix the fascia to the riser by pre-drilling holes top and bottom and screwing through the face of the fascia. Start at 80mm approx then at every 300mm approx intervals. Ensure that the fascia finishes flush with the top of the deck board and leave a 2mm expansion gap when joining fascia.

Sorry, this item is currently out of stock.
We currently hold [remaining-stock] units of this item in stock. The remainder will be put on back order.
You cannot order more of this item than we currently hold in stock.
You must order at least [min-order-qty] of this product.