COVID19 UPDATE: We are open as normal and delivering safely working to Government guidelines keeping both our staff and customers safe.

Handling & Storage

Looking After Your Assured Composite Decking

When handling and storing Assured Composite products follow the advice of our experts, this helps prevent damage and injury before installation.​

• When moving any Assured Composite product please ensure the correct safety equipment is worn.
• Check that the area where the products are being placed is clear and free from any obstacles.
• Ensure the ground is a flat hard surface and place wooden patterns every 450mm approx intervals to support deck boards and joists above the ground.
• We advise that 2 people move deck boards and joists. This is down to the weight and length.
• Do not drag or slide any deck boards or joists especially when laying on top of one another.
• Allow 24 hours for products to get used to the environment before installation.
​• Any deck boards or joists stored for a long period of time inside or out will need covering.

Sorry, this item is currently out of stock.
We currently hold [remaining-stock] units of this item in stock. The remainder will be put on back order.
You cannot order more of this item than we currently hold in stock.
You must order at least [min-order-qty] of this product.