Installing Assured Composite Fascia

Installing Assured Composite Fascia To Your Cladding

  • Carefully plan the area checking all measurements. Measure and cut fascia where required.
  • Fix the fascia by pre-drilling holes top and bottom and screwing through the face of the fascia. Start at 80mm approx then at every 300mm approx intervals. Ensure that the fascia finishes flush with the cladding board. Leave a 2mm expansion gap when joining fascia.
  • Fascia can also be fixed into place using a high bond strength grab adhesive.